30 years of industrial audits.
Subsidized by Hydro-Québec.
Accelerated by AI.
A full deep-dive audit for mining, sawmills, foundries, and heavy manufacturing — compressed into 2 weeks of focused work with your team. Start with a free 5-minute diagnostic below. No commitment, no email gate.
























Run a 5-minute diagnostic on your plant. Right here.
No commitment. No email gate. You'll see a savings band, carrier breakdown, top ECMs ranked by payback, and whether your electrical audit qualifies for Hydro-Québec's Efficient Solutions Program (SEA).
From first question to verified savings.
Three stages, each with a fixed output. No open-ended consulting engagements. Each stage stands alone — you can stop, start, or skip based on where you are.
Diagnostic
Answer 8 questions about your plant. Get a directional savings band, carrier breakdown, top ECMs ranked by payback, and HQ eligibility check.
Deep-dive audit
Our team spends 2 weeks on-site and in your data. You get an engineering-grade report with measured baselines, 15–25 ECMs sized and costed, and funding applications prepared. Requires your team's engagement: motor lists, data access, site visit, meetings.
Monitor & verify
Continuous tracking of implemented ECMs against baseline. Monthly variance alerts, annual recertification, real savings verified — not just projected.
Our audits qualify under Hydro-Québec's Efficient Solutions Program.
The Systèmes Efficaces (SEA) program covers up to 75% of the cost of qualifying energy-analysis engagements for Québec industrial customers. We handle the application and technical requirements. You get a funded audit.
Check your eligibilityWhat used to take 3 months
takes 2 weeks.
We kept every step of the ISO-50002 audit process. We rebuilt the parts that don't need a human engineer: interval-data parsing, baseline regression, ECM library search, code generation for M&V scripts, and report drafting.
Five industries. 324 ECMs in the library.
Not a generic platform. Each sector has its own baseline models, carrier weights, and ECM library — tuned against 30 years of completed audits in that industry.
Québec sawmills.
~$400–650K/yr recoverable.
Representative ranges from Opnor's 2-week deep-dive engagements on mid-sized hardwood sawmills. Actual figures vary by plant size, carrier mix, and implementation scope. Client-approved case studies with named figures will replace this section as they publish.
Your plant is leaking energy.
Find out where.
5 minutes. No email gate. Directional savings band, top ECMs, HQ eligibility. Decide from there whether a 2-week audit makes sense.