ENERGY-OS v3 · Hydro-Québec SEA qualified

30 years of industrial audits.
Subsidized by Hydro-Québec.
Accelerated by AI.

A full deep-dive audit for mining, sawmills, foundries, and heavy manufacturing — compressed into 2 weeks of focused work with your team. Start with a free 5-minute diagnostic below. No commitment, no email gate.

No email gate · 5 minutes · Sawmills · Mining · Foundries · Pulp & paper
energy-os / diagnostic.live
streaming
Recoverable / year
+24% headroom
$420K$840K
1224% of spend · directional band
Top ECMs · 56 identified
view all →
01VFDs on kiln fans$110220K2.1y
02Compressed air leak program$85160K1.4y
03Heat recovery on kilns + presses$140280K3.2y
Electrical portion eligible · Hydro-Québec Efficient Solutions (SEA)
Trusted by 50+ industrial plants · from sawmills to mining complexes
Opnor client 1
Opnor client 2
Opnor client 3
Opnor client 4
Opnor client 5
Opnor client 6
Opnor client 7
Opnor client 8
Opnor client 9
Opnor client 10
Opnor client 11
Opnor client
Opnor client 1
Opnor client 2
Opnor client 3
Opnor client 4
Opnor client 5
Opnor client 6
Opnor client 7
Opnor client 8
Opnor client 9
Opnor client 10
Opnor client 11
Opnor client
$100M+
client savings
700,000
tCO₂ avoided
30 yrs
industrial track record
HQ eligible
audits qualified under SEA
01 · The product moment

Run a 5-minute diagnostic on your plant. Right here.

No commitment. No email gate. You'll see a savings band, carrier breakdown, top ECMs ranked by payback, and whether your electrical audit qualifies for Hydro-Québec's Efficient Solutions Program (SEA).

Savings band
$420K–$840K / yr
ECMs identified
56 for wood products
HQ eligibility
Checked against SEA criteria
Start your diagnostic
energy-os · makeover report · live
step 3 / 3
Savings band
$420K$840K
per year
Carrier mix
Elec58%
Gas28%
Diesel14%
Top ECMs
01VFDs on kiln fans$110220K2.1y
02Compressed air leak program$85160K1.4y
03Heat recovery on kilns + presses$140280K3.2y
Live · Interactive
02 · The method

From first question to verified savings.

Three stages, each with a fixed output. No open-ended consulting engagements. Each stage stands alone — you can stop, start, or skip based on where you are.

01
5 MIN · FREE · NO EMAIL

Diagnostic

Answer 8 questions about your plant. Get a directional savings band, carrier breakdown, top ECMs ranked by payback, and HQ eligibility check.

Duration5 minutes
OutputDirectional report
CostFree
CommitmentNone
02
2 WEEKS · SEA ELIGIBLE

Deep-dive audit

Our team spends 2 weeks on-site and in your data. You get an engineering-grade report with measured baselines, 15–25 ECMs sized and costed, and funding applications prepared. Requires your team's engagement: motor lists, data access, site visit, meetings.

Duration2 weeks
OutputISO-50002 audit
CostHQ SEA eligible
CommitmentSigned SOW
03
ONGOING · M&V-GRADE

Monitor & verify

Continuous tracking of implemented ECMs against baseline. Monthly variance alerts, annual recertification, real savings verified — not just projected.

DurationOngoing
OutputMonthly M&V
CostSubscription
Commitment12-mo min
03 · Funding

Our audits qualify under Hydro-Québec's Efficient Solutions Program.

The Systèmes Efficaces (SEA) program covers up to 75% of the cost of qualifying energy-analysis engagements for Québec industrial customers. We handle the application and technical requirements. You get a funded audit.

Check your eligibility
hydro-québec · sea · eligibility matrix
march 2026
Coverage
Up to 75% of audit cost
Eligible sector
Industrial · Agriculture · Commercial ≥ 500 kW
Eligible carrier
Electricity (primary) · Natural gas via Énergir partnership
Audit standard
ISO-50002 or equivalent
Deliverable
Opnor 2-week deep-dive report
Application
Opnor submits on your behalf
Typical timeline
4–6 weeks from SOW to funded kickoff
Eligibility confirmed case-by-case · program evolves annually
04 · AI acceleration

What used to take 3 months
takes 2 weeks.

We kept every step of the ISO-50002 audit process. We rebuilt the parts that don't need a human engineer: interval-data parsing, baseline regression, ECM library search, code generation for M&V scripts, and report drafting.

Data ingest + clean5–7 days4 hours96%
Baseline models10–14 days1 day93%
ECM library match2–3 weeks2 days88%
Report drafting2 weeks2 days86%
Engineering review1 week3 days60%
audit timeline · weeks
TRADITIONAL CONSULTING12 weeks
W1W4W8W12
OPNOR · AI-ACCELERATED2 weeks
W1W4W8W12
Compression factor
faster — same ISO-50002 scope, same engineering sign-off
05 · Coverage

Five industries. 324 ECMs in the library.

Not a generic platform. Each sector has its own baseline models, carrier weights, and ECM library — tuned against 30 years of completed audits in that industry.

Coming next · Cement · Aluminum · Food processing
view the full ECM library →
06 · Typical engagement

Québec sawmills.
~$400–650K/yr recoverable.

Representative ranges from Opnor's 2-week deep-dive engagements on mid-sized hardwood sawmills. Actual figures vary by plant size, carrier mix, and implementation scope. Client-approved case studies with named figures will replace this section as they publish.

Engagement typeMid-sized hardwood sawmill
Typical baseline$3–6M / yr · 65–75% electrical
ECMs identified15–20 per audit
ECMs implemented60–70% of identified
Typical capex range$600K–$1.1M
Typical HQ funding$300K–$500K (SEA + custom)
Verified savings10–15% annual reduction
Typical payback1.5–2.5 yrs (net of funding)
monthly energy spend · measured vs. baselinesample · illustrative
Month 7 of 12 · tracking 4.1% above forecast
ON TRACK
$250K$300K$350KECM-01ECM-04ECM-09AprMayJunJulAugSepOctNovDecJanFebMarbaselineactual
Sample band
$400–650K
Typical best ECM
Kiln VFDs
M&V cadence
Monthly
Ready when you are

Your plant is leaking energy.
Find out where.

5 minutes. No email gate. Directional savings band, top ECMs, HQ eligibility. Decide from there whether a 2-week audit makes sense.

No credit card · No sales call · Instant results